In March, 2023, we removed the large millstones and are storing them to be reinstalled at a future date. We also removed the old steel water reservoir and trees on the east side of the building.
A big thank you to Brad's Crane Service for going above and beyond after being contracted to provide crane services to the Mill.
The millstone is being secured so it can be lifted out with the crane.
This log is being turned on the sawmill for additional cutting into a block.
This log has been trimmed and is now ready to be cut into live edge slabs
We will keep you posted on additional work as it occurs.